Acushnet Conservation Commission Approves Septic Repair at 50-Home Mobile Home Park

ACUSHNET — October 8, 2025 — Acushnet Conservation Commission clears way for septic overhaul at 50-home mobile home park. The commission voted unanimously at its October 8 meeting to issue a negative determination for Brookside Realty Trust's plan to remove and replace a failing mound-style leaching system at 1094 Main Street, where approximately 50 homes share a single system that has been deteriorating for roughly 18 months. Engineer David Devinion of Schneider, Devinion, and Leone told commissioners investigators found a cracked pipe, a leaking pump chamber vent, and a septic tank with seams so compromised that "water was pouring in." All contaminated soil will be excavated and hauled off site, with the project completed in two phases to keep part of the system in service. Two solar cases — a 4,999-kilowatt battery storage project on Park Drive and the Clemsway Solar ground-mounted array at 1094 Main Street — were continued to October 22, as was a residential pool-and-cabana application at 12 Arches Way after the applicant's engineer failed to appear.

Keep reading with a 14-day free trial

Subscribe to The Acushnet MA Post to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to The Acushnet MA Post

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Bristol County News · The Attleboro Post · The Berkley Post · The Dartmouth Post · The Dighton Post · The Easton Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.